Conception Calculator
Estimated Conception Date
Tue, 20 Jan, 2026
Likely Range: Sun, 18 Jan, 2026 – Thu, 22 Jan, 2026
Estimated Due Date
Tue, 13 Oct, 2026
When did conception happen?
Conception usually happens around ovulation, about two weeks after the first day of the last period. Working back from the due date, it is about 266 days (38 weeks) earlier. This calculator estimates the likely date and a range of a few days either side.
How the conception date is estimated
Conception ≈ due date − 266 days, or first day of last period + 14 days
Pregnancy is counted from the last period, about two weeks before conception, so a pregnancy of 40 weeks lasts about 38 weeks from conception. The likely range is two days either side, because the egg can be fertilised up to a day after ovulation and sperm can survive several days before it.
Good to know
- The date is an estimate. Ovulation timing varies, so conception can easily be a few days either side.
- A due date from an early ultrasound (before 13 weeks) gives the most reliable conception estimate.
- After IVF, the conception date is known: the day of egg retrieval, or the transfer date minus the embryo's age.
- A conception date can't establish paternity with certainty, because the possible window spans several days. Only a DNA test can.
- This calculator gives estimates for information only and is not a substitute for advice from a doctor.
Worked example
- Due date given by the doctor: 15 June 2027
- Conception: 15 June 2027 − 266 days = around 22 September 2026
- Likely range: 20 to 24 September 2026
- Working from a last period that started on 1 October 2026 instead, conception was around 15 October 2026, with a due date of 8 July 2027
Conception date by due date
Estimated conception dates for due dates through 2027.
| Due date | Likely conception | Range |
|---|---|---|
| 1 January 2027 | 10 April 2026 | 8 April 2026 – 12 April 2026 |
| 1 March 2027 | 8 June 2026 | 6 June 2026 – 10 June 2026 |
| 1 May 2027 | 8 August 2026 | 6 August 2026 – 10 August 2026 |
| 1 July 2027 | 8 October 2026 | 6 October 2026 – 10 October 2026 |
| 1 September 2027 | 9 December 2026 | 7 December 2026 – 11 December 2026 |
| 1 November 2027 | 8 February 2027 | 6 February 2027 – 10 February 2027 |
Each date is 266 days before the due date, with two days either side.